Why carry out these two developments?
The small hydropower plant (SHPP) will produce 100% local, green electricity using the water of the Rhone. This structure will therefore participate in reaching the French government’s targets regarding the development of renewable energies.
CNR has associated the construction of a fish pass with the hydropower plant that will improve the passage of fish species by aiding their access to the Rhone from the river Gardon, a tributary. This pass illustrates CNR’s commitment in favour of biodiversity.
Key figures
The small hydropower plant:
8,5 MW
installed capacity
50 000 T
of CO2/year avoided, i.e. the equivalent of 230 million kilometres travelled in a car
60 GWh
is the estimated output, equivalent to the annual electricity consumption of 26,000 people, i.e. twice the population of Villeneuve-lès-Avignon (Gard)
The fish pass:
11 m
total head height
330 m
total length
46
basins
The species that benefit
A video counting zone in the structure measures the passage of species. Monitoring will be carried out by angling associations to evaluate fish activity.
Key construction phase
- 2018-2020 – Study and design
- Autumn 2022 – Laying foundations
- 2022-2025 – Construction of structures
- Spring 2025 – Installation of turbine
- Winter 2025-2026 – Assembly of electric installations
- Spring 2026 – Commissioning of the SHPP and fish pass
Small hydropower plant and fish pass of Vallabrègues Durée : 1:45 min
Progress on the construction of the small hydroelectric power station and fish pass at Vallabrègues Durée : 1:30 min